Products & Services

Our Products

Our Services

Ruber installation

As a rubber installation company, we install a 1- 2 layer system of various different colors. we start by laying down a base layer which consists of a polyurethane binder and and finely shredded recycled tires. We then proceed to lay a half inch ware layer on top of the base layer. The rubber then needs 24-48 hours of drying time before use.

Stone sub-base installation

We also offer sub-base installation if needed, crushed limestone, crushed concrete, etc. to keep the rubber from sinking and for your playground to have a strong and solid base. 

 

Repair old rubber

Repairing old rubber surfacing is something that we often do when you’re our old rubber has any cracks, sinkholes, open seams, or other types of damage. We recommend getting any damages to your surfacing fixed as soon as possible to prevent further damages.

Design & logos

When it comes to design work, We combine rubber and your imagination. Designs can be installed in any color, shape or size. 

Scroll to Top